Named green hydrogen from 240 MW PEM electrolysis using behind-the-meter Sunnyside wind plus NL Hydro backup, ~30,000 t/yr Phase 1. Intermediate for MCH LOHC; not sold as compressed/liquid H2 in the EA copy. HP can process 60,000 tpa hydrogen if Phase 2 is later approved. May produce with first production targeted 2030. CBSA 2804.10 hydrogen (T2026 ch.28). Not commodity grey SMR hydrogen. Plant street not stored. No named directory seaport gate.
Form
bulk
Stage
refined
Cold chain
no
Green hydrogen (Phase 1 PEM, Come By Chance) | North Atlantic Refining Corp. | Source Desk Canada