Named Point Tupper Green Fuels Project anhydrous green ammonia for domestic and export markets. Company: Phase 1 ~200,000 t/yr from renewable power, planned operations 2028; Phase 2 ~800,000 t/yr additional. EA approved 2023; FEED complete; construction targeted to begin 2027. Intermediate green hydrogen converted on site. RFNBO pre-certification named for design. May produce — FID and offtake still in progress as of 2026. CBSA 2814.10 anhydrous ammonia (T2026 ch.28). Load via Point Tupper own dock (not a directory gateway). Plant street not stored.