EverWind Fuels Company
EverWind
Unclaimed desk
- Location
- Halifax, Nova Scotia
- Main products
- Nova Scotia person EverWind Fuels Company (EA proponent; federal lobbyist registry previous in-house name EverWind Fuels Company, later EverWind NS Holdings Ltd.). Corporate / head office 2101-1969 Upper Water Street, Halifax NS B3J 3R7 (company contact and project pages; CB Insights / PitchBook headquarters). Phone 902-201-0643 and info@everwindfuels.com on the Point Tupper project contact block. Founded 2021; NS Registry of Joint Stock Companies registration early 2022. Owns and operates the long-standing Point Tupper marine fuels terminal (4090 Industrial Park Road — plant / terminal street not stored) with deepwater berths and liquids storage; tug services to third parties named. Named Point Tupper Green Fuels Project: EA approved Feb 2023 (first large-scale green H2/ammonia EA in North America); FEED complete; Phase 1 ~200,000 t/yr green ammonia from renewable power, planned operations 2028; Phase 2 ~800,000 t/yr additional ammonia. Construction at Point Tupper targeted to begin 2027 (company project page). Green hydrogen is the intermediate for ammonia and a named clean-fuel product for domestic and export markets (H2Global / offtake discussions). Extra electricity: Phase 1 onshore wind (Bear Lake, Windy Ridge, Kmtnuk, Upper Afton) connecting to the Nova Scotia Power grid under PPAs in finalization; company: Phase 1 power available to the province at peak demand and to support clean-fuels production. Phase 2 Guysborough wind dedicated to the plant via Strait Crossing Transmission Line (EA Apr 2025) — not stored as a separate sold SKU beyond the electricity desk hook. CAD$240M Nuveen investment (Mar 2026) for first ~650 MW wind phase. Burin Peninsula NL green fuels project and New York office not stored as HQ. EverWind NL land-reserve pause is a separate census row. No FID announced for the H2/ammonia plant as of mid-2026 press; may produce — listed under Jeffery may-produce rule. No named Canadian directory seaport (CAHAL / CASJB) as EverWind cargo gate; Point Tupper own dock is not in the gateway list. Empty gatewayIds. Not a conventional refined-fuels seller for this listing.
- Kind
- goods
- Stage
- refined
- Year established
- 2021
- Employees
- 51-100
- HS codes
- 280410, 281410, 271600
- NAICS
- 325120, 325313, 221119
- Form
- bulk, dangerous-goods
- Reply language
- en
- Website
- everwindfuels.com/, LinkedIn
- Phone
- 902-201-0643
Request information
Products
About
Halifax-headquartered Canadian clean-fuels developer. Named Point Tupper green hydrogen and green ammonia (Phase 1 ~200 kt/yr ammonia, planned operations 2028) plus Nova Scotia wind generation feeding the grid and the plant. Owns/operates Point Tupper Terminal (plant street not stored). No named directory seaport gate.
- Legal name
- EverWind Fuels Company
- Trade name
- EverWind
- Year established
- 2021
- Employees
- 51-100
- Physical address
- 2101-1969 Upper Water StreetHalifax, Nova ScotiaB3J 3R7
- Mailing address
- 2101-1969 Upper Water StreetHalifax, Nova ScotiaB3J 3R7
- Phone
- 902-201-0643
- Website
- everwindfuels.com/
