Named WindEurope 2026 teaming with Riggs Distler and Smulders to fabricate offshore-wind components from Cherubini's 250,000-plus square feet of Dartmouth fabrication with quayside/barge access. Capacity and teaming, not a named delivered tower or blade mill. Extra fab-cnc-jobshop. CBSA 7308.90 (T2026 ch.73). Oversized. No named directory seaport.