Named Point Tupper Green Hydrogen and Ammonia Production, Storage and Loading Facility anhydrous green ammonia for domestic and export markets. Company: permitted up to 2 GW electrolyzers; full build-out up to ~2 million t/yr ammonia; Phase 1 from Websters Corner wind ~200,000 t/yr; first deliveries targeted 2028. NS EA approved with conditions 12 Apr 2023; peak ~2 Mt/yr via own Strait of Canso marine terminal (~40–60 specialty carriers/yr). Intermediate green hydrogen converted on site. No signed offtake as of company FAQ; initial markets named Europe and Asia. May produce — FID still outstanding as of 2026. CBSA 2814.10 anhydrous ammonia (T2026 ch.28). Load via Point Tupper own dock (not a directory gateway). Plant street not stored.