Wind and solar electricity (Mauricie self-generation)

TESCanada H2 Inc. · QC

Desk
Electricity (hydro, nuclear, wind)
HS code
271600
Description
Named Projet Mauricie self-generation: ~800 MW onshore wind (~120–125 turbines) plus ~200 MW solar PV (~1 GW total) to supply the Shawinigan electrolyzer, with power returned to Hydro-Québec at peak demand. Hydro-Québec grid covers about one-third of plant power. May produce with construction 2027 and turbines on stream end 2029. Extra electricity desk. CBSA 2716.00 electrical energy (T2026 ch.27; ISED 271600 Electrical energy). Not a fossil generator. Wind/solar site streets and the Shawinigan plant not stored.
Form
bulk
Stage
refined
Cold chain
no

Request information

Ask this desk anything — grades, samples, export, shipping. Quantity helps if you already know it. This is a request for information, not a binding quote.