Named Websters Corner Wind Farm, Pictou County, Nova Scotia. Company: preliminary ~100 turbines / ~500 MW to power Phase 1 Point Tupper green hydrogen and ammonia; electricity placed onto the Nova Scotia Power grid with equivalent hourly withdrawal at the plant (interconnection request named); surplus, if any, delivered to the NS Power grid if needed. In-service targeted late 2028; wind EA registration was targeted 1Q 2025 on the company FAQ (not confirmed as filed). May produce / generate. CBSA 2716.00 electrical energy (T2026 ch.27). Not a fossil generator. Guysborough Crown-land wind award not stored as a separate SKU.