Hydra Energy Canada Corporation
Hydra Energy
Unclaimed desk
- Location
- Delta, British Columbia
- Mailing address
- 590 Ebury Place, #102, Delta, BC, V3M 6K7, CA
- Main products
- Canadian person Hydra Energy Canada Corporation (OrgBook BC1272220 HYDRA ENERGY CANADA CORPORATION, ACT BC Company, Filing:AMALR / Amalgamation Application (Regular) registered 29 Oct 2020, BN 845126333 not stored; NRCan OTD 2025 lead proponent Hydra Energy Canada Corporation, Delta BC; Canada.ca 21 Nov 2025 same legalName in Delta, British Columbia). Do not translate legalName. Trade Hydra Energy / Hydra / Hydrogen-as-a-Service / HaaS (hydraenergy.com; CHA member Hydra Energy; LinkedIn Hydra Energy, aliases hydra energy, hydra energy corporation; privately held; Founded 2012; Headquarters Delta). Predecessor OrgBook BC1067139 HYDRA ENERGY CANADA CORPORATION, HIS BC Company, Incorporation Application 4 Mar 2016, BN 780649927, amalgamated 29 Oct 2020 into BC1272220 — historical of this seller, do not new-slug. Predecessor 0953173 B.C. LTD. (BC Corporate Registry Notices 25 Oct 2012 incorporation of 0953173; 6 Sep 2013 0953173 B.C. LTD. to HYDRA ENERGY CORPORATION; 21 May 2018 HYDRA ENERGY CORPORATION to HYDRA ENERGY HOLDINGS CORP.; 21 Feb 2019 HYDRA ENERGY HOLDINGS CORP. to HEG HOLDINGS CORP.; 29 Oct 2020 HEG HOLDINGS CORP. inc. 0953173 and HYDRA ENERGY CANADA CORPORATION inc. 1067139 amalgamated as HYDRA ENERGY CANADA CORPORATION BC1272220) — historical of this seller, do not new-slug. OrgBook BC1067138 HYDRA ENERGY GLOBAL CORPORATION HIS, Event:SYSDF 26 Mar 2024, BN 780698098 — dissolved sibling, do not new-slug. OrgBook BC1164986 HYDRA ENERGY REM PG CORP. HIS, Event:SYSDF 21 May 2024, BN 752913715 — dissolved Prince George SPV, do not new-slug. No ISED CBCA person on Hydra Energy / Hydra Energy Canada Corporation / Hydra Energy Corporation (federal Corporations Canada search empty 31 Aug 2026 — BC, not federal). GLEIF: no LEI on Hydra Energy Canada Corporation / HYDRA ENERGY CANADA CORPORATION / Hydra Energy / Hydra Energy Corporation (golden copy 31 Aug 2026 publishDate 2026-08-31T08:00:00Z; legalName and fulltext searches empty). CIPO Canadian Trademarks Database: no live Canadian word-mark row returned on HYDRA ENERGY / HYDROGEN-AS-A-SERVICE / HAAS for this person — do not invent a CIPO number. Not Hydron Energy Inc. (live hydron-energy; different seller). Not Diesel Tech Industries Ltd. (live diesel-tech-industries; Edmonton Guardian HDS diesel–hydrogen kits). Not HTEC Hydrogen Technology & Energy Corporation (live htec). Not Azolla Hydrogen Ltd. (live azolla-hydrogen). Not Ballard Power Systems (later census Burnaby PEM fuel cells; Jo Borck past Ballard engineer is biography, not this mill). Not First Truck Centre (named installation partner with 13 facilities through Alberta and British Columbia — installer, not this mill). Not Chemtrade (newswire partner supplying green hydrogen offtake — partner mill, not this person’s hydrogen SKU). Not Dymin Mechanical / Veteran Express Secure Logistics (VEXSL) / Edmonton International Airport (named fleet / MOU customers). Not 1040 West Georgia Street Suite 800 Vancouver V6E 4H1 (2023 consultant-lobbyist business address — lawyer civic, not stored as HQ). Census Hydra Energy, British Columbia, diesel–hydrogen dual-fuel kits and corridor stations is this mill of this Canadian seller. Head office Unit 15, 1610 Derwent Way, Delta BC V3M 6W1 (BC Lobbyists Registry organization Hydra Energy Canada Corporation, active, last updated 11 Dec 2025, Address Unit 15 - 1610 Derwent Way Delta BC V3M 6W1; CB Insights headquarters 15 - 1610 Derwent Way Delta V3M 6W1; LinkedIn 15 - 1610 Derwent Way Delta; company Careers: Hydra Energy’s office is based on Annacis Island, Delta, with operations in Prince George; 18 Jul 2023: installation done at Hydra’s research facility in Delta, BC). Mill=siège: named conversion-kit R&D / fabrication shop sits at this Annacis Island civic (Careers Machining & Fabrication Assistant, prototype trucks and research and development truck; 18 Jul 2023 research facility). HQ street of the selling person, also the mill — stored. Company Contact mailing address 590 Ebury Place #102, Delta BC V3M 6K7 (Contact: Hydra Energy is located in a suburb of Vancouver; Our mailing address is 590 Ebury Place # 102 Delta BC V3M 6K7 CANADA; Our offices are not open to the public) — stored as mailing, not as a second physical HQ. 9048 Sintich Rd / Sintich Road and Northern Crescent, Prince George V2N 5S8 (City of Prince George 19 Sep 2023 LOS request; BIV five-acre hydrogen production and refuelling station) is the named corridor plant / station, not stored as HQ. EIA land hydrogen station (22 Sep 2022 groundbreaking; 27 Apr 2022 MOU) is a planned customer-host station, not stored. Port of Prince Rupert / Port Edward station exploration is a corridor test / may-produce site, not stored. Invest Vancouver case study Established in 2012 in West Vancouver is founding history, superseded as siège by the live Derwent / Annacis block, not stored. Established 2012 (company About Back in 2012; LinkedIn Founded Year 2012; 0953173 B.C. LTD. incorporated Oct 2012). 29 Oct 2020 amalgamation is not yearEstablished. LinkedIn employs 13 people — employeeRange 11-50. Named goods: proprietary hydrogen-diesel co-combustion conversion kit for existing Class 8 diesel engines — H2 gas handling behind or under cab, H2 injection manifold in-line with air intake blending H2 and air before the engine block with no engine modification, dedicated controller and wiring harness behind the dashboard (ECU) with no interception of OEM ECU messages; fully reversible; up to 40% GHG reduction; over 300,000 km on-road testing (company Technology / Fleets). 18 Jul 2023: 2024 Western Star converted in 10 hours at the Delta research facility; Alberta Innovates Hydrogen Centre of Excellence grant CAD$50k; training program with First Truck Centre. NRCan OTD 2025 Active, agreement value $1,350,000, project total $3,011,070, location BC; Canada.ca 21 Nov 2025 over $1.4 million including IRAP up to $75,000; commercial trucks converted to hydrogen co-combustion currently operating in British Columbia. Commercial / demonstration — listed as supply (may-produce / list even if export unconfirmed). Extra named Prince George flagship hydrogen production and refuelling station (company 20 Sep 2022 groundbreaking world’s largest hydrogen refuelling station; two on-site 5 MW electrolyzers, 3,250 kg/day design, four bays; BIV May 2024 delayed from early 2024 to fall 2026; HaaS planned flagship) — may-produce hydrogen, listed; plant civic not stored. Extra named Highway 16 Western Canadian Hydrogen Corridor (Prince Rupert – Prince George – Edmonton) and Port of Prince Rupert Innovate BC Integrated Marketplace pilot (company 29 Aug 2025 / 20 Jan 2026 Boosting clean technology in the North; $1-million PRPA/Hydra hydrogen-fuelling station and LEV test) are corridor / test programs, not a second mill and not a named directory cargo gate. Extra named Chemtrade green-hydrogen offtake (newswire) is partner supply, not this mill’s hydrogen. Extra named dedicated ECU / machine-learning calibration (NRCan: develop Canadian IP for hydrogen control systems and machine learning algorithms) is kit hardware, not a second instruments-controls mill. Extra instruments-controls desk not used. Extra truck-trailer desk not used (kits, not trucks). Extra power-equipment desk not used (HaaS stations are this person’s corridor plants / partner-procured infrastructure, not a sold electrolyzer SKU this pass). Extra industrial-gases desk not used (HaaS hydrogen sits on hydrogen-clean-fuels, not merchant air gases). Extra hybrid-diesel desk not used. Company desk 778-400-8804 (Contact). LinkedIn 1-778-400-9321 is a third-party scrape, superseded as the live desk by the Contact number. Inquiry info@hydra-energy.ca (company EIA 27 Apr 2022 reach out to info@hydra-energy.ca). Named-person officer / media (hydraenergy@technicacommunications.com) skipped. No company sentence names Vancouver (CAVAN / CYVR), Prince Rupert (CAPRR), Calgary Airport (CYYC) or any other directory gateway as Hydra Energy Canada Corporation’s cargo gate (Prince Rupert is a named corridor / truck-pilot port, not this person’s seaport load). Empty gatewayIds rather than a fake CAPRR or CAVAN. Prince George station, EIA host, West Vancouver founding and lawyer streets not stored as HQ.
- Kind
- goods
- Stage
- fabricated
- Year established
- 2012
- Employees
- 11-50
- HS codes
- 840999, 280410
- NAICS
- 336390, 325120
- Form
- container-ready, dangerous-goods
- Reply language
- en
- Website
- www.hydraenergy.com/, LinkedIn
- Phone
- 778-400-8804
Request information
Products
About
Delta-headquartered BC corporation (mill=siège Annacis Island). Named hydrogen-diesel co-combustion conversion kits for Class 8 fleets plus may-produce Prince George corridor hydrogen (two 5 MW electrolyzers; delayed to fall 2026). No named directory seaport.
- Legal name
- Hydra Energy Canada Corporation
- Trade name
- Hydra Energy
- Year established
- 2012
- Employees
- 11-50
- Physical address
- 1610 Derwent WayUnit 15Delta, British ColumbiaV3M 6W1
- Mailing address
- 590 Ebury Place#102Delta, British ColumbiaV3M 6K7
- Phone
- 778-400-8804
- Website
- www.hydraenergy.com/
