Blackrod SAGD thermal bitumen, 100% IPC, Athabasca, Alberta. 15 Jun 2026 release: Phase 1 first oil 31 May 2026; pipeline-connected for gas and condensate input and crude output onto the Grand Rapids Pipeline to Edmonton; plateau 30,000 bopd expected late 2027. Q2 2026 results: ramp-up continues; inventories at the CPF and batching station; oil subsequently shipped on Grand Rapids to be sold at Edmonton; more significant production and sales volumes expected Q4 2026. OSM Aug 2026: Blackrod Pilot and Blackrod Phase 1 both Operating. Not gasoline, diesel or jet. Not neat mined tar sands (HS 2714). Malaysia and France crude is not this Canadian product.