Named ~3.5 GW onshore wind (up to 534 turbines across Botwood, Twin Lakes, Leading Tickles and Seabrights Lake WPAs) plus 150 MW solar feeding the hydrogen/ammonia plant behind the meter. EIS: application to Newfoundland Power for up to 50 MW grid connection for construction and critical loads; possible surplus to the provincial grid. Extra electricity desk. Not a merchant generator SKU in the EA; listed because the wind/solar block is named and the census flags electricity. May produce with 2027–2030 build. CBSA 2716.00 electrical energy (T2026 ch.27). Not a fossil generator.