Named Phase 1 Nova Scotia onshore wind projects (Bear Lake, Windy Ridge, Kmtnuk, Upper Afton) connecting to the Nova Scotia Power grid. Company: PPAs with Nova Scotia Power in finalization; Phase 1 power available to the province at peak demand and to support Point Tupper clean-fuels production. ~650 MW first wind phase backed by CAD$240M Nuveen investment (Mar 2026). May produce / sell into the provincial market. CBSA 2716.00 electrical energy (T2026 ch.27). Not a fossil generator.